Skip to content
KRYVANA
File
KRV-RES-I1
Reading time
17 min
Updated
2026-11-27

White-label wellness equipment: how it works

White-label wellness equipment is a machine produced by a factory but delivered under your brand: logo, colours, rating plate, packaging and, where the firmware allows, start-up screen and programme names. You supply your files, you approve a proof before production, and the machine is compared with that proof before shipment. Who counts as the manufacturer under EU law when the machine carries your brand must be validated by a regulatory consultant.

By Kryvana · published 27 November 2026 · updated 27 November 2026

What “white label” means for a machine, and what it does not mean

In a recovery centre, the machines occupy the room where your customers spend the most time. If each one shows the logo of a different factory, a standard interface and anonymous packaging, your brand stops at the door of the cabin. White label answers that specific problem.

The principle: your equipment is produced by a selected factory under your brand rather than its own. The customisation covers what can be seen and read:

  • the logo on the housing;
  • the colour of the housing, from the factory colour chart or to your RAL or Pantone reference;
  • the rating plate;
  • the packaging;
  • where the firmware allows, the start-up screen and programme names;
  • at the most advanced level, the housing or cover itself, and accessories.

The detail by level is on the White label page. This article explains how it works overall: what is possible, in what order, with what limits, and who carries which responsibility.

What white label is not

Four misunderstandings need clearing up before we talk about levels.

It is not a machine designed for you. The technology, the electrical architecture, the performance and the safety components are those of the factory's model. White label changes the visible identity, not the design. A machine drawn up to your specification is a different project, with its own study and its own tests.

It is not a sticker applied at reception. Sticking your logo on a machine delivered under the factory's brand leaves the rating plate, the screen, the instructions and the carton under another name. In white label, the customisation is done at the factory, during production, from a document you have approved.

It is not a guarantee of technical difference. Two centres can run the same base model under two brands. What sets you apart is your identity, your customer journey, your welcome protocols. The article Building a consistent centre identity down to the equipment coming soon develops this point.

It is not a way of removing identification obligations. The housing, the plate and the packaging carry your brand. But for electrical equipment, the Low Voltage Directive requires the name and address of the manufacturer and of the importer to appear on the equipment or, failing that, on the packaging or in an accompanying document. Knowing who holds the role of manufacturer when the machine carries your brand is the most sensitive point of the subject: we come back to it below.

The three customisation levels

The site describes three levels. Each one takes the previous one and adds to it. The “What is included” column reproduces the White label page word for word; the “For which project” column is only a guide.

LevelWhat is includedFor which project
StandardLogo on the housing (printed or industrial adhesive), housing colour from the factory colour chart, rating plate in your brand, neutral packagingOne or several machines, a brand to display without lengthening the project
AdvancedStandard, plus RAL or Pantone colour of your choice, start-up screen and programme names (depending on firmware), packaging in your brand, branded product photo kitA centre that also wants its screen and packaging in its brand, or a reseller building a range
BespokeAdvanced, plus specific housing or cover, interface adaptation with the factory, branded accessories and consumables, prior feasibility studyA showcase centre, a hotel or a spa whose image is its main asset, a differentiated reseller range

The Standard level fits within the production lead time. The Advanced level introduces two dependencies: the firmware (screen, programme names) and, sometimes, a minimum quantity set by the factory. The Bespoke level begins with a feasibility study, and it is the one where the regulatory question arises most strongly: modifying the machine itself does not have the same consequences as changing a colour.

The article Customising your machines: logo, colours, interface, packaging coming soon goes through each element, one by one.

What can be customised, family by family

Customisation is not approached the same way on a cryotherapy chamber, a wooden sauna or an electrostimulation suit. The following table reproduces what the catalogue pages state for each of the eleven families.

FamilyCustomisable elements stated on the site
CryotherapyExternal housing in your RAL colour, logo on the door and the front panel, start-up screen and programme names where the factory allows it, rating plate in your brand, branded product photo kit
Hyperbaric chambersShell colour (rigid) or cover colour (soft) in your RAL, logo on the shell and the control panel, rating plate in your brand
LED light therapyBed shell or panel frame in your RAL colour, logo on the cover and the control screen where the factory allows it, programme names depending on firmware
Cold bathsExternal housing in your RAL or in wood, logo engraved or screen-printed on the apron, temperature display in your brand where the model allows it
SaunasWood species and finish, glass front, logo engraved on the door or the front panel, lighting and control in your brand where the model allows it
Flotation tanksPod shell or cabin front in your RAL, logo on the cover or the door, lighting and sound ambience programmed in your brand
IHHTUnit cover in your RAL, logo on the chassis and the welcome screen where the firmware allows it, programme names depending on the software
PEMFCover and console in your colour, logo on the console and the screen where the firmware allows it, programme names depending on the software
EMSSuits and generator in your colours, embroidered or screen-printed logo, welcome screen and programme names where the software allows it, branded base layers for your members
PressotherapyAccessories and unit in your colours, logo embroidered on the boots, welcome screen in your brand where the firmware allows it, programme names depending on the software
DiagnosticHousing and welcome screen in your brand, measurement reports with your logo (depending on software)

The housing, the colour and the logo are almost always available. Everything that goes through a screen carries the same reservation: “where the factory allows it”, “depending on firmware”. That is the real limit of the subject, detailed below. The medium also changes the technique (engraving, screen printing, embroidery, printing), hence feasibility checked model by model.

The files to supply

Customisation starts with three elements on your side.

  1. A vector logo, in SVG, AI or PDF format. A bitmap image of a logo (a screenshot, a file taken from a website) is not enough for industrial printing: enlarged on a cabin door, it turns blurry, and it cannot drive an engraving or a cut.
  2. Your colour codes, in RAL or Pantone. A colour described by a word (“midnight blue”, “sage green”) or by a screen code does not give a reproducible shade on sheet metal, plastic or fabric. RAL and Pantone are reference systems that the factory can match.
  3. Your brand guidelines, if you have them. They specify the versions of the logo (horizontal, vertical, monochrome), the clear zones and the prohibited uses. Without guidelines, these decisions are made at the proof stage.

Two practical tips.

  • Prepare a monochrome version of the logo, useful if the chosen marking (engraving, screen printing, embroidery) is done in a single colour.
  • If you want to rename the programmes, prepare the list of names at the same time as the files. These names belong to your communication: they describe a session, a duration, an atmosphere, never an effect promised on the body.

From proof approval to the pre-shipment check

The customisation process takes four steps on the White label page. It fits into the general sequence of a project, described on the How it works page: customisation is the fourth of the eight steps, between model selection and production.

Step 1: the files

You supply your vector logo, your colour codes and, if you have one, your brand guidelines. This is the previous section.

Step 2: feasibility

We check with the factory what can be done on the chosen model: printable surfaces, firmware, packaging. This is the step where firm answers appear. One logo position is possible, another would get in the way of an access hatch. The start-up screen can be replaced, or it cannot. Printed packaging requires a minimum quantity, or it does not.

What is possible is stated to you model by model, before the order. This avoids promising on paper a customisation that the factory will later refuse.

Step 3: the proof

You receive a proof: views of the machine, with the colours and the positions of the markings. Your written approval triggers production.

The proof is the central document of white label: before shipment, the machine is compared with it, and discrepancies are corrected. That is why it is worth reading it in detail before signing it.

What to look at before signing a proof:

  • the exact reference of each colour, and the material it applies to (the same reference does not render the same on lacquered metal and on plastic);
  • the size and position of the logo on each face, with dimensions;
  • the text of the rating plate, line by line;
  • the start-up screen and the list of programme names, if the model allows it;
  • the faces of the packaging, if the packaging is customised;
  • what remains standard, so as not to discover it on delivery.

Step 4: production and check

Production starts on receipt of the deposit. Production photos and videos let you follow progress.

Before shipment, the machine is compared with the proof: photos are sent to you and discrepancies are corrected. This customisation check is carried out at the same time as the check of the labelling, the translated instructions and the rating plate provided for by the procedure on the Compliance page. The deliverable of this step is a pre-shipment inspection report.

How a factory is chosen and followed up beforehand is described in the article Factory audit in China: the points we check coming soon.

The limits: interface, firmware, quantities

Here is what really bounds a customisation.

The interface and the start-up screen depend on the factory

This is the reservation that comes up most often in the family table. Replacing a start-up screen, renaming programmes or changing the interface language assumes that the machine's firmware was designed for it. Some factories offer it, others do not, and the same factory may offer it on one range and not on another.

If the interface matters a great deal to you, it is a selection criterion for the model, to be raised from the factory comparison onwards. When the screen cannot be customised, you still have the housing, the plate and the packaging.

The same colour can look different depending on the material

A RAL or Pantone reference designates a shade; a plastic cover, lacquered sheet metal and a fabric can nevertheless render it with different nuances. Ask for the proof to state the material for each colour, and keep in mind that the comparison before shipment is made on photos. If a shade is critical for you, say so at the feasibility stage.

Some levels require a minimum quantity

The Standard level is possible on a single machine. The Advanced and Bespoke levels sometimes require a minimum quantity set by the factory: printed packaging, a shade outside the colour chart or a specific cover may depend on it. This quantity depends on the model and the factory. It is stated on the quote: on request

Anything that touches safety cannot be freely customised

Pictograms, warnings, the electrical characteristics on the rating plate and the instructions in the manual are not decoration. They belong to the compliance documentation. A logo does not cover a pictogram, a housing colour does not hide a marking. Likewise, a change to the cover that would alter ventilation, access or a protection is no longer customisation: it is a modification of the machine, to be examined together with the technical file.

Programme names stay within the wellbeing frame

Renaming programmes is a freedom of brand, not a freedom of claims. A programme name that promises an effect on the body engages your communication and can change the way the device is regarded by the regulations. Names describe a session, not a result.

Your brand on the plate: the question of the manufacturer under EU law

This is the point not to skim over. We present it as it is: an open question, to be validated.

What the texts say

Two texts that we have consulted set out the same logic.

Regulation (EU) 2023/988 on general product safety defines the manufacturer as the person who manufactures a product, or has it designed or manufactured, and markets it under their own name or trademark (Article 3, point 8). Its Article 13 adds that a person who places a product on the market under their own name or trademark is considered a manufacturer and subject to the manufacturer's obligations under Article 9. The same article also covers whoever substantially modifies a product. One important limit: for a product subject to Union harmonisation legislation, Articles 9 to 18 of this Regulation, including Article 13, do not apply (Article 2(1)). The Low Voltage Directive is part of that legislation (list in Annex I to Regulation (EU) 2019/1020, to which Article 3, point 27 refers).

Directive 2014/35/EU on low voltage electrical equipment also defines the manufacturer as whoever manufactures, or has designed or manufactured, the equipment and markets it under their own name or trademark (Article 2). Its Article 10 adds that an importer or a distributor is considered a manufacturer when they place electrical equipment on the market under their name or trademark, or when they modify equipment already on the market in a way that may affect its compliance. Its Articles 6 and 8 require the manufacturer and the importer to indicate their name and address on the equipment or, failing that, on the packaging or in an accompanying document.

Other texts apply depending on the equipment family (electromagnetic compatibility, machinery, pressure equipment, radio equipment). The Compliance page lists them by family. Four of them lay down the same rule as the Low Voltage Directive: an importer or distributor is considered a manufacturer when it places the product on the market under its name or trade mark, or modifies it in such a way that compliance may be affected. This is Article 11 of Directive 2014/30/EU (electromagnetic compatibility), Article 10 of Directive 2014/68/EU (pressure equipment), Article 14 of Directive 2014/53/EU (radio equipment) and Article 17 of Regulation (EU) 2023/1230 on machinery. Machinery Directive 2006/42/EC, which that regulation repeals, does not contain this rule: it does not deal with importers and defines the manufacturer as the person who designs or manufactures the machinery and is responsible for its conformity with a view to placing it on the market under its own name or trade mark, or for its own use; in the absence of such a manufacturer, whoever places the machinery on the market or puts it into service is considered the manufacturer (Article 2(i)).

Why we do not settle the question

These rules are easy to read. Applying them to a specific project is less simple, for several reasons.

  • Who places the product on the market? In our set-up, the factory manufactures, Kryvana imports, and you operate the machine in your centre. An operator who uses a machine is not in the same position as a reseller who resells it under their brand.
  • Which name appears where? The brand on the housing, the name on the rating plate, the name in the EU declaration of conformity and the name on the instructions are not necessarily the same. It is their combination that counts.
  • Which text applies? Regulation (EU) 2023/988 covers products intended for consumers or likely, under reasonably foreseeable conditions, to be used by them, including in the context of a service (Article 3, point 1). It applies insofar as Union law does not contain specific provisions with the same objective (Article 2). Equipment sold to a professional but used by their customers deserves an analysis, not an assumption. Where its operator obligations apply, it also requires an economic operator established in the Union to be responsible for certain compliance tasks (Article 16).
  • Does the customisation modify the machine? A logo and a colour do not change the design. A specific cover or an interface adaptation may raise the question of modification.

On the site, the “Who does what” table on the Compliance page divides the obligations between the factory (manufacturer), Kryvana (importer) and you (operator). The line “manufacturer within the meaning of EU law in the case of white label” is not filled in there: this role is being validated by a regulatory consultant.

In plain terms: we will not tell you, in an article, who is the manufacturer of your white-label machine. This qualification must be validated by a regulatory consultant, for the chosen set-up and for the equipment family concerned, before the order. It determines who signs the EU declaration of conformity, who keeps the technical file and which name appears on the plate.

What this changes for you, in practice

  • If you operate a centre: raise the question before approving the text of the rating plate on the proof. It is a line of the proof like any other, but it has legal weight.
  • If you are a reseller: the question is central, since you sell the machine under your brand. The Resellers page puts it the same way: the exact role under white label is being validated. The article GPSR: the role of the responsible person in the EU coming soon takes this point further.
  • In all cases: our commitment remains the same. We check and complete the compliance documentation of every piece of equipment before shipment. No customisation replaces that file, and none makes it unnecessary.

Finally, certain products without a medical purpose fall under Annex XVI to Regulation (EU) 2017/745: for example equipment emitting high-intensity light used for skin treatment, equipment intended to reduce adipose tissue or for transcranial brain stimulation (points 4 to 6). That Regulation assesses the intended purpose of a device from the labelling, the instructions and the advertising or sales materials (Article 2, point 12): programme names and your communication may form part of them. Here too, the qualification is validated with a consultant, case by case.

Buying direct from the factory or through a European distributor

White label and the purchasing route are linked. Depending on the route, you do not have the same access to the factory, and therefore not the same latitude for customisation.

CriterionEuropean distributorBuying alone from the factoryBuying from the factory with Kryvana
Brand on the machineDepends on the distributor's offerYours, if you negotiate the customisation yourselfYours, from an approved proof
ContactThe distributorThe factory, remotelyA French-speaking contact from the plan to commissioning
Compliance documentationTo request from the distributor and to readTo obtain, check and complete yourselfChecked and completed before shipment
InstructionsDepends on the distributorOften in Chinese or EnglishIn French and in the languages of the delivery country
Parts and after-salesDepends on the distributorNo contact in case of breakdownRemote assistance, express shipment of parts, stock of critical parts
PriceDepends on the distributor and the services includedFactory price, plus everything you have to organisePrice negotiated at the factory, transport and services itemised separately

On price, buying from a European distributor comes down to this: the same machine, from the same factory, passes through two or three intermediaries. What that costs: often 2 to 3 times the factory price, before fit-out and installation. This is not a market statistic: we have no quantified study to cite, and the gap varies with the equipment family, the volume and the services included. An established distributor can also provide stock, a local presence and a service that have value.

The article Buying direct from the factory or via a European distributor: costs and risks coming soon compares the routes item by item. For what follows in the life of the machine, see Warranty, spare parts and after-sales: how it works coming soon.

Who white label makes sense for

Not every project needs the same level.

  • You are opening a centre. The Standard level across all the equipment already gives a consistent identity. The Advanced level is justified on the most visible machines. Decide machine by machine, not as a block.
  • You run a spa, a hotel or a residence. Your image is your asset: the interface matters, so the firmware becomes a criterion for choosing the model from the start. See the Spas and hotels page.
  • You are a distributor or reseller. Advanced white label (packaging, interface) is the heart of the subject, with two questions to settle first: the quantity and rhythm of orders, and the regulatory role described above. Territorial exclusivity is not automatic: it is discussed.

Before signing: lead times, budget and points to check

Lead times

Customisation is added to a schedule that already includes production, inspection, sea or consolidated transport, customs clearance and installation. The Standard level fits within the production lead time; the Advanced and Bespoke levels may extend it depending on the factory. We do not publish a typical lead time until it is confirmed:

  • production lead time of a machine at the Standard level: on request
  • additional lead time for the Advanced and Bespoke levels: on request
  • transport lead time to the premises: on request

The quote sets a schedule. The article Production and delivery lead times for a customised machine coming soon explains what the schedule is made of and what makes it slip. On your side, a single factor depends entirely on you: how quickly you supply your files and approve the proof.

Budget

The cost of customisation depends on the level, the model, the quantity and the factory. It is itemised line by line on the quote: on request

Payment follows the quote's schedule: on request

Equipment budgets remain indicative ranges excluding taxes, transport, installation and local taxes, until a tailor-made quote is signed.

The checklist

Before approving a white-label project, check that you have a written answer to each of these points.

  1. The customisation level is set machine by machine.
  2. Feasibility has been confirmed by the factory for the exact model, including the screen and the programmes.
  3. Any minimum quantity is written on the quote.
  4. The proof shows all faces, all colours with their reference, and the text of the rating plate.
  5. The name that appears on the plate and in the EU declaration of conformity has been validated by a regulatory consultant.
  6. Programme names contain no promise of an effect on the body.
  7. The schedule distinguishes production, customisation, transport and installation.
  8. The pre-shipment check provides for sending photos and correcting discrepancies against the proof.
  9. The list of documents delivered with the machine is attached to the quote.
  10. The terms of warranty and parts supply are written down.

When these ten points have an answer, white label stops being a sales promise: it becomes a file, with a reference document and a check. To open yours, the full quote request form takes five minutes; you can attach your logo to it.

Frequently asked questions

What is white-label wellness equipment?

It is a machine designed and produced by a factory, then customised to the brand of whoever operates or resells it: logo, colours, rating plate, packaging, sometimes the interface. The technology remains the factory's; only the visible identity changes.

Which files do I need to supply to customise a machine?

A vector logo (SVG, AI or PDF), your RAL or Pantone colour codes, and your brand guidelines if you have them. A bitmap image of a logo is not enough for industrial printing.

Can the interface and the start-up screen be changed?

Only when the factory firmware allows it. The start-up screen, programme names and sometimes the interface language are checked model by model, before the order.

Who is considered the manufacturer when the machine carries my brand?

European texts provide that whoever places a product on the market under their own name or brand may be subject to the manufacturer's obligations. How this applies to your situation depends on the set-up chosen: it must be validated by a regulatory consultant before the order.

Can a single machine be customised?

Yes for the Standard level. The Advanced and Bespoke levels sometimes require a minimum quantity set by the factory, stated on the quote.

Does customisation extend the lead time?

The Standard level fits within the production lead time. The Advanced and Bespoke levels may extend it depending on the factory. The exact lead time is stated on the quote.

About the author

Kryvana

Kryvana sources recovery equipment at the factory, checks and completes its compliance documentation, customises it to the client's brand, and delivers and installs it in France, Luxembourg, Belgium and Switzerland.

White label and sourcing file

7 articles
  • I2Customising your machines: logo, colours, interface, packaging coming soon
  • I3Building a consistent centre identity down to the equipment coming soon
  • I4Buying direct from the factory or via a European distributor: costs and risks coming soon
  • I5Factory audit in China: the points we check coming soon
  • I6Production and delivery lead times for a customised machine coming soon
  • I7Warranty, spare parts and after-sales: how it works coming soon

All resources

KRV · 10.I1/12

Budget, choice of machines, premises, import compliance, reading a forecast: the free guide “Opening a centre” and its two templates to fill in.

Get the guide