- Sheet
- KRV-CAT-CAISSO
- Family
- Flotation tanks
- Types
- 2
- Status
- To be quoted
- Rev.
- A
Professional flotation tank
A professional flotation tank holds 600 to 1,200 litres of water saturated with magnesium sulphate (Epsom salt), kept at around 35 °C, with filtration and disinfection between each session. The pod (opening lid) takes up less space; the cabin (closed room) offers more comfort and is simpler to clean. The factory price depends on volume, filtration system and finishes.
Flotation is the equipment that demands the most rigour in operation: 450 to 650 kg of dissolved salt depending on the format, water to be renewed under a strict hygiene plan, and a soundproofed, ventilated room. Two formats come out of the factory: the pod and the cabin. This page compares the two, sets out the wet-area and acoustic requirements, and details the consumables. Indicative budgets excl. VAT, excluding transport and installation.
Machine types
2 types| Type | Technology | Capacity | Power | Floor area | Indicative budget |
|---|---|---|---|---|---|
| Flotation pod | Composite shell with opening lid, 600 to 900 L, heating, filtration, UV and/or ozone | 1 person | 1.5 to 2.5 kW, 230 V | 6 to 8 m² (pod + shower) | specified in the quote |
| Flotation cabin | Closed room with built-in basin, 900 to 1,200 L, full-height door, lighting | 1 to 2 people | 2 to 3.5 kW, 230 V | 8 to 12 m² (cabin + shower) | specified in the quote |
Indicative budget excluding transport, installation and local taxes. Bespoke quote.
How to choose
Flotation is decided on the layout plan: wet area, acoustics, floor structure. If those three are in place, the cabin is the simplest format to run; otherwise, the pod.
Premises prerequisites
| Electricity | 230 V 16 A per unit, 30 mA residual-current protection, continuous water heating. |
|---|---|
| Wet area and acoustics | Waterproof floor with drain, adjoining shower, soundproofed partitions, ventilation against humidity and salt air. |
| Floor load | Water + salt + shell: 1,000 to 2,000 kg; a structural check is mandatory on an upper floor. |
| Corrosion | Salt air: plan for resistant materials (316 stainless steel, plastics) in the room. |
Available customisation
Documentation supplied
- EU declaration of conformity (low voltage, EMC, RoHS)
- Manual in French: filling, salt dosing, filtration, disinfection, renewal
- Standard hygiene plan and water logbook
- Labelling: power, ingress protection rating
Generic list by family: the exact content depends on the model and its file. We check and complete the compliance documentation of every machine before shipment.
Running costs
| Energy | Continuous water heating at 35 °C and filtration between sessions. |
|---|---|
| Consumables | Epsom salt (450 to 650 kg at filling depending on the format, regular top-ups), disinfectant, filters, UV lamp. |
| Maintenance | Daily water check, full renewal according to the hygiene plan, tank cleaning. |
Example sheets
2 sheetsTwo typical configurations per family, with typical specifications to be replaced by those of the selected model.
| Visual to be supplied | Model | Power | Capacity |
|---|---|---|---|
| Flotation cabinClosed room with a built-in 1,100 litre basin, full-height door, lighting: the most comfortable format and the simplest to clean. | 2 to 3.5 kW | 1 to 2 people | |
| Flotation podComposite pod with opening lid, 800 litres of Epsom-salt-saturated water at 35 °C, filtration and UV: the compact flotation format. | 1.5 to 2.5 kW | 1 person |
Frequently asked questions
Pod or cabin?
The pod takes up less space and costs less; the cabin offers more headroom, a conventional door and simpler cleaning, which clients uneasy in enclosed spaces appreciate.
How much salt is needed?
450 to 550 kg for a pod, 550 to 650 kg for a cabin, of magnesium sulphate at filling, then top-ups to maintain density. The cost of salt is an operating cost in its own right.
How is water hygiene managed?
Full filtration between two sessions, UV and/or ozone disinfection, a compulsory shower before the session, daily checks recorded in a log, and planned renewal. The local obligations for water open to the public must be checked.
What sound insulation is needed?
Flotation requires silence: insulated partitions, a solid door, no noisy neighbours (weights room, street). Acoustics are adjusted in the layout plan.
What budget should I plan for?
Indicative ranges appear in the table as soon as they are supplied; excluding transport, installation, salt and local taxes. Quote tailored to your project.
Further reading
- Float tank: price, installation and operation
- Water and salt treatment for a float tank coming soon
- Float pod or float room: which format to choose? coming soon
Related solutions : Spas and hotels · Entrepreneurs
Let us price your Flotation tanks
Tell us which families interest you: we come back with a comparison of factories and a first estimate.