How it works: a project in eight steps

A project follows eight steps, always in the same order: discovery call, study and layout plan, selection and samples, customisation, production and quality control, compliance and documentation, delivery with installation and training, then after-sales. You have a single point of contact from start to finish.

The eight steps

  1. 01● You are here

    Discovery call

    30 minutes: your project, your premises, your budget, your schedule. We tell you whether we can help and at which level of support.

  2. 02

    Study and layout plan

    Surfaces, electrical power, ventilation, wet areas, floor loads, customer flow. Each machine gets its place and its prerequisites.

  3. 03

    Selection and samples

    Comparison of two to three factories per family, based on data sheets; samples or components sent by express where relevant.

  4. 04

    Customisation

    Logo, colours, interface, packaging: feasibility checked with the factory, proof submitted for your approval.

  5. 05

    Production and quality control

    Starts on receipt of the deposit. Production photos and videos, end-of-line check, comparison with the approved proof.

  6. 06

    Compliance and documentation

    Checking and completion of the technical file, the EU declaration, the instructions and the labelling; third-party tests where necessary.

  7. 07

    Delivery, installation, training

    Sea freight or consolidated shipping, customs clearance, delivery to your premises, commissioning and team training according to the level chosen.

  8. 08

    After-sales and spare parts

    Remote assistance, express shipping of parts through our FedEx account, on-site intervention if necessary, stock of critical parts.

What you receive at each step

StepDeliverable
01 Discovery callSummary and list of information to gather
02 Study and layout planLayout plan and prerequisites sheet for each machine
03 Selection and samplesComparison table and detailed quote
04 CustomisationApproved proof
05 Production and quality controlPre-shipment inspection report
06 Compliance and documentationCompliance binder
07 Delivery, installation, trainingCommissioning report
08 After-sales and spare partsAfter-sales contact and maintenance log

Frequently asked questions

How long does a project take?

The duration depends on the level of customisation, factory lead times and transport; the quote sets a schedule.

When do you pay?

The balance follows the payment schedule on the quote, generally before shipment.

Can we visit the factory?

Yes, on request, for Complete Centre and Flagship projects; we organise the visit in Guangzhou or Ningbo.

Who installs?

Our team or a trained local partner, depending on the country; installation is included in the Project and Turnkey levels.

Step 1: the discovery call