Flotation tank: price, installation and operation
The price of a professional flotation tank depends on three things: the format (pod with a lid or closed cabin), the water volume (600 to 1,200 litres) and the filtration and disinfection system. The real budget adds transport, installation in a wet area, the first fill of Epsom salt (450 to 650 kg depending on the format) and consumables. Our ranges are indicative, excluding VAT, and confirmed by a tailored quote.
By Kryvana · published 27 November 2026 · updated 27 November 2026
What you are really buying with a flotation tank
A flotation tank is not a machine you simply put down and plug in. It is a basin of 600 to 1,200 litres of water saturated with magnesium sulphate (Epsom salt), kept at around 35 °C, with filtration and disinfection between every session. Around the basin, you need a room: watertight, quiet, ventilated, with an adjoining shower.
That is why the question "flotation tank price" has no honest answer in a single figure. The price of the equipment is one line of the budget. The other lines weigh just as much in the decision: the floor structure, the wet area, the acoustics, the first fill of salt, the consumables, the turnaround time between two clients.
Flotation is also the equipment in our catalogue that demands the most rigour in operation. 450 to 650 kg of dissolved salt depending on the format, water to be renewed under a strict hygiene plan, daily checks that must be logged. A centre that underestimates this buys a handsome object and inherits a constraint.
This article follows the order in which an investor should ask the questions:
- which format to choose, pod or cabin;
- what makes up the price, and what it leaves out;
- what the premises must offer before delivery;
- how salt, water and hygiene are managed;
- what operation costs, line by line;
- which documents must come with the unit;
- what can be customised to your brand.
All the technical values quoted here come from our flotation tank page and our two example sheets. Commercial data that is not yet settled is flagged as such: we prefer an empty box to an invented figure.
Pod or cabin: two formats, two ways of operating
Two formats come out of the factory. The choice between them determines the price, the floor space, the floor load and the daily routine of your team.
The flotation pod
The flotation pod is a composite shell with an opening lid. It holds 600 to 900 litres of water, takes one person, and includes heating, filtration and UV and/or ozone disinfection. Our example sheet describes an 800-litre pod of about 2,400 × 1,500 × 1,200 mm, weighing 1,200 kg with water.
It is the compact format: 6 to 8 m² is enough for the pod and its shower. It costs less than the cabin. In return, the space is closed and low: a client who is sensitive to enclosed spaces will prefer the cabin, and the shell is cleaned through the lid.
The flotation cabin
The flotation cabin is a closed room with a built-in basin. It holds 900 to 1,200 litres, takes one or two people, with a full-height door and integrated lighting. Our example sheet describes a 1,100-litre cabin of about 2,600 × 1,800 × 2,300 mm, weighing 1,800 kg with water.
The client comes in through an ordinary door, with headroom. It is the most comfortable format and the simplest to maintain. It needs 8 to 12 m² including the shower, slightly more power and a floor able to carry almost two tonnes.
Comparison of the two formats
| Criterion | Flotation pod | Flotation cabin |
|---|---|---|
| Principle | Composite shell, opening lid | Closed room, built-in basin, full-height door |
| Water volume | 600 to 900 L | 900 to 1,200 L |
| Capacity | 1 person | 1 to 2 people |
| Power | 1.5 to 2.5 kW, 230 V | 2 to 3.5 kW, 230 V |
| Floor space with shower | 6 to 8 m² | 8 to 12 m² |
| Weight with water (example sheets) | 1,200 kg | 1,800 kg |
| Salt for the first fill (example sheets) | 450 to 550 kg | 550 to 650 kg |
| Cleaning | Low shell, access through the lid | Access through the door, simpler |
| Budget | The lower of the two | Higher than the pod |
How to decide
Flotation is decided on the layout plan, not from a catalogue. Three points matter: the wet area, the acoustics, the floor structure. If all three are in place, the cabin is the simplest format to run. If one of the three is constrained (tight floor space, an upper floor with limited load capacity), the pod becomes the sensible choice.
The profile of your clientele also counts. A spa or a hotel, where the experience comes first, benefits from the comfort of the cabin. A recovery centre that optimises every square metre looks at the pod first. Our detailed comparison pod or flotation cabin coming soon goes through these trade-offs one by one.
Flotation tank price: what makes up the budget
Indicative ranges
Ranges appear here as soon as they are supplied for a specific model.
- Flotation pod, indicative range excluding VAT: on request
- Flotation cabin, indicative range excluding VAT: on request
Indicative budget excluding transport, installation and local taxes. Tailored quote.
What we can state without a figure: the pod is the lower-cost format, and the factory price depends on the volume, the filtration system and the finishes.
What makes the price of the equipment vary
Four factors explain the gap between two quotes that seem to cover the same product:
- The format and the volume. A 1,100-litre cabin, with its structure, its door and its lighting, represents more material and more labour than an 800-litre pod.
- Filtration and disinfection. Pump, filter, UV lamp, ozone: depending on whether the model combines one or several technologies, and on the sizing of the pump, the price and the turnaround time change.
- The materials. Salty air calls for corrosion-resistant parts (316 stainless steel, plastics). This is a point to read in the data sheet, not in the brochure.
- Customisation. Shell or front colour, logo, programmed lighting and sound ambience: each option is priced.
The lines the factory price does not include
A factory price is not a budget. To compare two offers, line up the same items in each column.
| Item | What it covers | Amount |
|---|---|---|
| Equipment | Pod or cabin, filtration, disinfection, heating | On request |
| Transport and customs clearance | Shipping from the factory, import formalities | On request |
| Installation and filling | Positioning, connections, first fill, settings | On request |
| First fill of salt | 450 to 650 kg of Epsom salt depending on the format | On request |
| Fit-out of the room | Waterproofing, floor drain, shower, acoustic partitions, ventilation | To be priced by your tradespeople from the plan |
| Structure check | Opinion on the load capacity of the floor, mandatory on an upper floor | To be priced by a design office |
| Customisation | Colour, logo, programmed ambience | On request |
Two of these lines do not depend on us: the fit-out of the room and the structure check. They are priced locally, from the plan. Send your tradespeople the data from the model sheet (dimensions, weight with water, power) before they prepare their quote.
The commercial terms follow the same rule of caution. Manufacturing and delivery lead time: on request. Warranty: on request.
Installation: what the premises must offer before delivery
Installing a flotation tank is prepared well before delivery. Seven points have to be settled on the plan. Our article choosing your premises coming soon places these constraints within the overall project.
Floor load
Water, salt and shell together weigh 1,000 to 2,000 kg, concentrated on a few square metres. Our pod sheet specifies a structure supporting 1,300 kg; the cabin sheet states almost two tonnes. On an upper floor, the structure check is mandatory: have a professional carry it out before you sign the lease or the purchase order, not after.
Water: filling and shower
The basin is filled once, then runs in a closed circuit until the scheduled renewal. You therefore need a water point nearby for filling and top-ups. The adjoining shower, for its part, is used at every session: the client showers before entering (a hygiene rule) and afterwards (to rinse off the salt). It is part of the stated floor space: 6 to 8 m² for a pod, 8 to 12 m² for a cabin.
Electricity and heating
Plan a 230 V 16 A supply per unit, with 30 mA residual-current protection. Power ranges from 1.5 to 2.5 kW for a pod and from 2 to 3.5 kW for a cabin. The water heating runs continuously to hold 35 °C: consumption does not stop when the centre closes. This is a figure to build into your electricity contract and your operating account.
Filtration: the technical location
Pump, filter and UV lamp are built in or placed in the immediate vicinity depending on the model. Ask for their exact position: you must be able to reach the filter and the lamp without removing the casing or closing off the room. Filtration that is hard to reach is filtration that is poorly maintained.
Drainage
The floor of the room must be watertight, with a floor drain. The shower has its own drain. That leaves the full emptying of the basin, when the water is renewed: several hundred litres of very salty water to discharge at once. Before opening, have your municipality's sewerage service or the network operator confirm in writing whether, and on what conditions, this water may be discharged into the network.
Ventilation and corrosion
Water at 35 °C in a closed room produces humidity, in air laden with salt. You need ventilation that extracts the humidity and the salty air, and materials that withstand them: 316 stainless steel and plastics for everything that stays in the room (handles, hinges, grilles, light fittings). Avoid backing the room onto a space that contains sensitive electronic equipment without a watertight separation.
Acoustics
Flotation requires silence. A footstep, a bass line from a weights room or a slamming door is enough to spoil the session. Acoustics are adjusted in the layout plan: soundproofed partitions, a solid door, no noisy neighbours (weights area, busy street, technical room).
Summary of requirements
| Item | Requirement |
|---|---|
| Electricity | 230 V 16 A per unit, 30 mA residual-current device, continuous heating |
| Wet area | Watertight floor with a drain, adjoining shower |
| Acoustics | Insulated partitions, solid door, quiet surroundings |
| Ventilation | Extraction of humidity and salty air |
| Floor load | 1,000 to 2,000 kg, check mandatory on an upper floor |
| Corrosion | Resistant materials in the room: 316 stainless steel, plastics |
| Floor space | 6 to 8 m² (pod and shower), 8 to 12 m² (cabin and shower) |
In our standard projects, flotation is part of the wet area, with the cold baths, the sauna and the showers. The Complete Centre pack reserves 40 to 60 m² for this area. Grouping the water-based equipment simplifies waterproofing, drainage and ventilation.
Salt and water treatment
Epsom salt: a budget item, not a detail
Buoyancy comes from the density of the water, obtained by dissolving magnesium sulphate to saturation. The quantities are large: our example sheets give 450 to 550 kg for the first fill of an 800-litre pod and 550 to 650 kg for a cabin of 1,000 to 1,200 litres.
Salt is not consumed in the strict sense, but it leaves the basin: on each client's skin and hair, in the filter, during cleaning. Regular top-ups are therefore needed to maintain the density. And every full renewal of the water requires a new fill of salt. The cost of salt is an operating cost in its own right, to be entered in your forecast from the start.
Three practical consequences:
- Storage. Several hundred kilos of salt in bags need a dry room, close to the treatment room, reachable with a hand truck.
- Supply. Quality of the salt and supplier: follow the manual of the model.
- Handling. A fill takes time and manpower. Plan it for a closed time slot.
Filtration and disinfection
Water treatment rests on three elements: a pump that circulates all the water in the basin, a filter that retains particles, and disinfection by UV and/or ozone. The cycle runs between two sessions. Its length depends on the water volume and the flow of the pump: it sets your minimum turnaround time.
To ask for each model before comparing two offers:
- the volume filtered per cycle and the length of the cycle;
- the type of filter, its reference and its replacement price;
- the disinfection technology, the service life of the UV lamp;
- the compatible disinfectant products, if any are needed in addition;
- access to the wear parts without heavy dismantling.
Water renewal and log
The water in a tank is not kept indefinitely. It is renewed according to the hygiene plan of the model, with a full cleaning of the basin. Recommended renewal frequency: on request.
Between two renewals, the water is checked every day and the checks are logged. The water log is supplied with the standard hygiene plan. It has two functions: managing the quality of the water, and proving your rigour if a client or an authority asks questions. Before opening, have the competent health authority in your country (in France, the ARS, the regional health agency) confirm in writing the health framework that applies to your tank.
Our article on water and salt treatment of a flotation tank coming soon details these operations. If your centre also runs cold baths, the routines are similar: see water hygiene of a cold bath used by the public coming soon.
Hygiene between two sessions
Tank hygiene comes down to a short routine, repeated without exception. It must be written down, displayed in the technical room and known to the whole team.
Before the session:
- the client showers, hair included, in the adjoining shower;
- they receive the usage instructions (entering, leaving, calling);
- the team checks that the previous filtration cycle has finished.
After the session:
- the client rinses to remove the salt;
- the team starts the full filtration cycle and the disinfection;
- the contact surfaces are cleaned: handles, edges of the basin, shower floor;
- salt left on the floor and the walls is rinsed off before it dries;
- the linen is replaced.
Every day:
- water check according to the hygiene plan, result logged in the log;
- check of the level, the temperature and the density, with a top-up if needed;
- a look at the filter and at the operation of the UV lamp.
Salt is the point of attention specific to flotation. It is deposited wherever water evaporates: door thresholds, hinges, floor, ventilation grilles. A systematic rinse at the end of each session prevents build-up and protects the materials. It is also a question of image: a flotation room is judged at first glance, and white marks give an impression of neglect.
Operation: turnaround, consumables, energy
Turnaround time sets your capacity
A tank does not sell hours, it sells slots. A slot adds up four times: the shower before, the session, the shower after, then the filtration cycle and the cleaning of the room. Only the second is billed.
- Session length usually offered: on request
- Length of the filtration and disinfection cycle between two sessions: on request
- Realistic number of slots per day and per tank: on request
Turnaround time is the first figure to obtain from the factory, before the price. Two tanks at the same price, one of which filters twice as fast, do not have the same selling capacity. If demand justifies it, a second unit increases capacity: our Flagship pack includes two flotation units in its wet area.
Finally, think about how your team is organised. Turning a tank around requires someone present at the end of each session. A centre where one person runs both reception and the treatment rooms must fit its flotation slots around those of the other equipment.
Operating items
| Item | Content | Figure |
|---|---|---|
| Energy | Continuous water heating at 35 °C, filtration between sessions | On request |
| Epsom salt | Regular top-ups, full fill at each renewal | On request |
| Disinfection | Disinfectant if any, UV lamp | On request |
| Filters | Periodic replacement | On request |
| Water | Top-ups, full renewals, showers | On request |
| Maintenance | Daily check, cleaning of the basin, scheduled renewal | On request |
| Linen | Towels, mats | To be priced according to your supplier |
A consumption figure stated by a factory is measured under the factory's conditions: room temperature, insulation of the premises, number of sessions. For each value, ask under what conditions it was measured.
Profitability: simulate, without promises
The session price, the occupancy rate and the share of members depend on your area, your positioning and your competition. We publish neither a standard session price nor a payback period.
To test your own assumptions, use the profitability simulator. Indicative simulation based on your assumptions. It is neither a promise of results nor financial advice.
A tip on method: simulate a cautious scenario first, with a low occupancy rate in the first year.
Documentation and compliance
A flotation tank is an electrical appliance installed in a wet environment and intended to receive the public. Its documentation is not a formality: it is what your insurer, your landlord or an inspection authority can ask you for.
The documents to receive
- the EU declaration of conformity (low voltage, EMC, RoHS);
- the manual in French: filling, salt dosing, filtration, disinfection, water renewal;
- the standard hygiene plan and the water log;
- the labelling: power, protection rating, rating plate in your brand;
- the technical file, available on request.
The texts that apply to this family
Without prejudging a specific model, a flotation tank falls in principle under the following texts:
- the Low Voltage Directive 2014/35/EU, which covers electrical equipment used between 50 and 1,000 V AC;
- the Electromagnetic Compatibility Directive 2014/30/EU;
- the RoHS Directive 2011/65/EU, which restricts certain hazardous substances in electrical and electronic equipment;
- if the model includes Wi-Fi or Bluetooth, the Radio Equipment Directive 2014/53/EU, whose essential requirements include electrical safety (the objectives of 2014/35/EU, with no voltage limit) and electromagnetic compatibility (2014/30/EU);
- Regulation (EU) 2023/988 on general product safety, which also covers products likely to be used by consumers, including as part of a service, for the risks that the specific texts do not cover;
- the WEEE Directive 2012/19/EU for end of life.
When several of these texts apply, a single EU declaration of conformity cites them all, with the harmonised standards used (Directive 2014/35/EU, Article 15 and Annex IV).
Our commitment fits in one sentence: We check and complete the compliance documentation of every piece of equipment before shipment. The compliance page explains the method and the split of roles between the factory, the importer and you.
Three checks to make yourself
- The declaration matches the model delivered. Reference, designation and manufacturer must be those on the rating plate.
- The manual describes your unit. A generic manual, without the diagram of your filtration, will not help you on the day of a breakdown.
- The hygiene plan is workable. Read it with the person who will do the maintenance, before opening.
That leaves the local health framework, specific to each country. Before opening, ask the competent authority in your territory which rules apply to a flotation tank used by the public. We do not settle this point for you.
Customisation: a tank in your brand
In a spa or a hotel, a machine with the factory logo spoils the experience. Flotation lends itself well to white label, because the equipment is large and visible.
What can be customised:
- the shell of the pod or the front of the cabin, in your RAL shade;
- your logo on the lid or on the door;
- the lighting and sound ambience, programmed to your brand;
- the labelling and the rating plate.
The exact scope depends on the factory and the model. Minimum quantity for customisation: on request. Effect on lead time: on request.
The white label page describes the process: files, feasibility, proof approval, check before shipment. For a hotel business, the spas and hotels page presents a selection of equipment and a standard layout.
A point of caution: Directive 2014/35/EU (Article 10) regards as the manufacturer an importer or distributor who places electrical equipment on the market under their own name or brand. Who carries this role in white label is being validated by a regulatory consultant.
From quote to commissioning: the criteria to bring together
What to prepare for a useful quote
A precise quote needs precise data. Gather it before writing to us:
- the plan of the premises, with the position of the wet area and the ceiling height;
- the floor and the type of floor;
- the electrical power available;
- delivery access: width of doors, corridors, stairs, lift;
- the format you have in mind (pod, cabin, or both) and the number of units;
- your level of customisation;
- your target opening date.
Compare your access routes with the dimensions of the model (2,600 × 1,800 × 2,300 mm for our example cabin) and ask whether it is delivered in one piece or in sections assembled on site.
The grid for comparing two offers
To compare two tanks, or our offer with that of a European distributor, always use the same criteria:
- water volume and weight with water;
- length of the filtration cycle, hence turnaround time;
- disinfection technology and price of wear parts;
- materials of the parts exposed to salty air;
- power and measured consumption;
- documents supplied, in French, for the exact model;
- warranty, availability of parts, response time;
- scope of the price: transport, installation, filling, salt.
How a project runs
A flotation project follows the eight steps of our other equipment, detailed on the how it works page: discovery call, study and layout plan, selection and samples, customisation, production and quality control, compliance and documentation, delivery with installation and training, then after-sales service. The layout plan, the installation and the training of your team are included from the Project level of our support.
If your premises are identified, request your quote: you will receive a priced proposal for the right format.