Skip to content
KRYVANA
Sheet
KRV-DIAG-SYSTEME-
Family
Diagnostics
Status
Example sheet
Rev.
A
Image to be supplied: VO2max system (cardiopulmonary testing)
Second image to be supplied: VO2max system (cardiopulmonary testing)

VO2max system (cardiopulmonary testing)

Gas analyser with mask, ergometer and test software: aerobic capacity measurement for a sporty clientele.

Indicative price excl. VAT
specified in the quote
Lead time
specified in the quote
Warranty
specified in the quote
Family
Diagnostics
Example sheet
Typical specifications: the exact model and its values are confirmed in the quote.

Indicative budget excluding transport, installation and local taxes. Bespoke quote.

Datasheet

typical specifications
DimensionsAnalyser on trolley + ergometer (typical)
Weight15 kg (analyser) + ergometer
Power supply230 V, 16 A (dedicated line for a treadmill)
Power0.5 to 2 kW
Capacity1 person, test of 15 to 30 min
Measurementexpired O₂ and CO₂, ventilation
Ergometerbike or treadmill
Calibrationgas and flow according to the manual
Softwareprotocols, reports, export

Available customisation

Trolley casing
Reports with your logo

Documentation supplied

  • EU declaration of conformity checked before shipment
  • Technical file available on request
  • Operating and maintenance manual in French
  • Labelling and rating plate in your branding

Installation and maintenance

Installation requirements

Dedicated line for a treadmill, ventilated room, safety space around the ergometer.

Maintenance

Calibration before each test, filter replacement, updates.

Frequently asked questions

Who supervises?

A trained operator, following the manufacturer's instructions and the local rules for exercise testing.

What consumables?

Masks or filters, calibration gas depending on the model.

How much space?

6 to 10 m² including the ergometer.

Request a quote for this model

Tell us which families interest you: we come back with a comparison of factories and a first estimate.

Request a quote for this model
KRV · 03.11.S/12

Budget, choice of machines, premises, import compliance, reading a forecast: the free guide “Opening a centre” and its two templates to fill in.

Get the guide